CrystalLine Hinge Door System with In-Line
Panel on Level
Installation Instructions
IMPORTANT: Read all instructions
carefully and become familiar with all parts before installation.
ATTENTION: If using CrystalLine Frameless
Door, refer to steps #4,
#7 &
#8 of the
CrystalLine Frameless Hinge Door Installation
Instructions for information regarding the hinge assembly,
drip rail & handle.
STEP 1
Threshold (A) is overcut and can be distinguished from header
(H) by the weep holes. Measure for threshold and cut.
STEP 2
Apply a generous bead of silicone based caulk to the underside
of threshold (A) and place assembly on curb. Using a level,
position the wall jambs (B) into the threshold and against the
wall, with the longer legs facing the opening. Mark through
the holes provided for anchoring. Drill 3/16" holes and insert
plastic anchors (C) for masonry applications or drill 1/8" tap
holes for fiberglass and acrylic units. Secure jambs to the
walls with #8 x 1-1/2" screws (D).
STEP 3
Place glass setting blocks (E) with legs facing down in threshold
about 3" from the wall and approximate location of the post
(G). Set glass panel (F) in place.
STEP 4
Using a level, position the H-post (G) with the deeper pocket
towards the glass panel (F). Standard glass penetration into
the wall jamb (B) and H-post (G) is 3/8".
STEP 5
The header (H) is overcut. Measure for header and cut. Place
header on top of unit.
STEP
Position the door assembly (J) into the opening. Plumb the door
assembly and secure it to the wall jamb (B) using #8 x 1/2"
Tek screws (K) through the holes provided.
STEP 7
Position the strike jamb (M) into the opening over the H-post
(G).
STEP 8
Position the header/threshold inserts (L) against the hinge
jamb and snap into place. Make certain upright leg is to outside
of shower.
STEP 9
Pull the strike jamb (M) flush against the header/threshold
inserts (L). Secure the H-post (G) to the threshold (A) and
header (H) with 9/64" tap holes and #8 x 7/16" screws (I). Secure
the strike jamb (M) to the H-post (G) using #8 x 1/2" Tek screws
(K) through the holes provided.
STEP 10
Drill 9/64" tap holes through the header to the wall jambs
(B) and H-post (G) and secure with #8 x 7/16" screws (I).
STEP 11
There are two different types of vinyl for glazing the panels
(F); vertical vinyl (N) and horizontal vinyl (O). The horizontal
vinyl is larger and installs first. Cut the vinyl to the opening,
trimming the ends on a 45° miter. Install the vinyl on the interior
side first by pressing into the threshold & header. Follow with
the exterior side, and then install the vertical vinyl the same
way being sure the corners fit tightly together.
NOTE: If vinyl is
difficult to press in, lubricate with glass cleaner.
STEP 12
Secure the drip anchor (AA) with sweep (BB) to the bottom
of the door panel (J) using #8 x 1/2" Tek screws (K).
The drip anchor should be flush with the bottom of the door.
STEP 13
Insert the drip channel end plug (DD) into the end of the
drip channel (CC). Position drip channel (CC) with the highest
point towards the strike jamb and angle down for desired drainage.
Secure with #6 x 7/32" screws (EE).
STEP 14
Install the handles (Q) with #6-32 x 1-1/2" screws (R) provided.
STEP 15
Caulk all edges and joints exposed to water using a silicone
based caulk or other suitable sealant that will prevent water
leakage.
|