Home Products About Us Software Order Info Forms Technical News Contact Us

Southeastern Aluminum Products

 

Signature Pivot Door

Curb To Header Installation Instructions

The top of the header must be accurately positioned at the overall unit height and on the vertical center-line of the glass at each wall. The header is fastened to each wall with a header wall mount bracket that is secured to the wall with 2" long screws put in the wall at a 30° angle downward. To accurately locate the bracket, a trial header set up must be made.

    To Install Using Glazing Channels

  • Using previously laid out vertical and horizontal centerlines, install the fixed panel glazing channel.
  • Cut the vertical glazing channel 9/16" shorter than the overall unit height for 3/8" glass or 1 1/4" shorter for 1/2" glass
  • Cut the header to the proper length.
  • Slide the header wall mount brackets into the header and lock them in place flush with the ends of the header. Check that the top of the header is at the overall unit height.
  • Transfer the location of the 30° sloping hole to the wall and drill a hole for a #10 x 2" long screw using the wall bracket as drill jig. Depending on the composition of the wall and backing, the installer must determine whether the 2" screws will secure to a stud or require a screw anchor.

    To Install Using Brackets

  • If the panel installation uses brackets rather than glazing channels, the brackets and panel glass should be installed first.
  • For 3/8" Glass: Temporarily place the header on the panel using two 1" long pieces of the vinyl glazing bead per panel. For 1/2" Glass: Temporarily place the header on the panel using two 1/16" thick setting blocks.
  • Check that the overall unit height is correct and drill the 30° sloping holes in the walls as described in the previous Curb to Wall Block Section.
  • Remove the header and put full-length pieces of vinyl on top of the panel glass.
  • Place the stick-on drill template provided to assure the mounting holes for the pivot header block are drilled in the proper location on the center-line of the header.
  • Drill the 7/32" holes for the #10-32 mounting screws.
  • Drill a 3/32" plumb bob line hole.
  • Install the header on the glass panels and fasten it securely to the walls.
  • Secure the pivot header block in place using the #10-32 screws and washers provided.
  • Thread the plumb bob line through the 3/32" hole in the header and use the plumb bob to locate and check that the base plate drill template is properly positioned on the curb.
  • Install the pivot base plate and then the door assembly as described in the General Installation section.